CPT Morooka Crawler

Overview

  • Based on the Morooka crawler vehicle
  • Relatively fast CPT Crawler rig (with speeds of over 12 km per hour)
  • Ideal for very soft soil with a low ground pressure of 28kPa

The CPT Morooka rig is fast and can travel long distances on asphalt or concrete surfaces without causing surface damage. The crawler tracks are made of rubber.

The renowned Cone Penetration Test (CPT) pusher, the HYSON 200 kN from A.P. van den Berg, is mounted on the Morooka CPT Crawler. The HYSON 200 kN pusher is limited by means of safety valves, so it will not exceed the 15 tons maximum payload of the Morooka. The penetrometer is operated via the touch screen.

The HYSON 200kN cones is two formats:

  • Professional โ€“ Hydraulic Push / Pull Clamp and Hydraulic Catch Clamp
  • Advanced โ€“ Mechanical Push / Pull Clamp and Hydraulic Catch Clamp

The hydraulic push/pull clamp facilitates fast efficient operation including easily changing from 36 mm CPT rods to 56 mm casing tubes.

CPT Morooka Xrawler

Cone Penetration Test (CPT) Sales, Calibration, Service and Spare Parts

Insitutek are proud to representย A.P. van den Bergย Cone Penetration Test (CPT) equipment in Australia, New Zealand and the Pacific Islands. Our CPT product range coversย CPT rigs and pushers, data acquisition systems, click on plug in and play modules for down hole Electrical Shear Vane Testing (EVST), Seismic CPT (SCPT), Conductivity and Magneto and MOSTAP soil sampling.ย We provide a high level of client support, from technical pre-sale consultations and supply of equipment to commissioning, user training, after-sale technical support,ย servicing, repairs, and calibrations. Our service centre is also well stocked with spare parts and consumables.

To find out more,ย Contact Us.

Brochures

CPT Morooka Crawler

CPT Morooka Crawler

Trusted by our clients

Select Plant Hire (Laing O'Rourke)
WANT Geotechnics
Wakefield Regional Council
CMW Geosciences
LBS Engineering
Protest Engineering
Red Earth Engineering
WSP Australia
Boom Logistics
Global Engineering & Construction
MPC Kinetic
South 32
Future Generations
Senversa
RJE Global
Macquarie Geotechnical
Life of Mine Engineering
Kleinfelder

Our Valued Partners:

Insitutek Blogs

A bridge approach transition zone is the area where a road or railway track transitions from the rigid structure of a bridge to the flexible embankment or road pavement, aiming to minimize abrupt changes in stiffness and potential issues like differential settlement.

The 5th International Conference on Transportation Geotechnics (ICTG), held in Sydney, marked a milestone in the geotechnical and transportation engineering community. Organized by the UTS Transport Research Centre (UTS-TRC), this prestigious event brought together over 450 delegates from 30 countries, making it a truly global gathering for experts in the field.

The ANCOLD 2024 Conference, held in Adelaide, brought together industry professionals in dam engineering, safety, and sustainability. With 624 delegates in attendance, the event provided a collaborative platform for experts to exchange knowledge on the latest developments in dam infrastructure, safety protocols, and environmental considerations. Key discussions focused on advancing dam engineering practices in response to climate change, improving risk-informed decision-making, and exploring new innovations in dam safety.