The SPARC (Smart Pavements Australia Research Collaboration) Hub, led by Monash University, held a successful two-day online workshop on intelligent compaction last September 29-30. The Hub is leading the effort to implement intelligent compaction (IC) technology and make further advancements in IC across Australia.
The workshop was packed with keynote presentations from renowned industry experts in various countries and wrapped up with panel discussions.
Here are our key take aways:
- Too much moisture (above optimum) causes air to be trapped in water during compaction.
- Consider degree of saturation (Sr opt approx = 80%) vs moisture content
- For fine grained soils (like clays), IC (accelerometer systems) are rarely used with pad foot / sheeps’ foot rollers. A 2007 report indicated the stiffness values were not reflective until final passes were made. Caterpillars’ Machine Drive Power (MDP), which uses a roller resistance principle, operates better with a shallower zone of influence.
- IC accelerometer systems require vibration / oscillation to measure pavement response
- For granular soils, moisture plays less of a role
- Sub grade soft spots propagate to the surface
- 1.67 is the average conversion factor between accelerometer and geophone Light Weight Deflectometers (LWD’s). Geophone systems have more variability.
- Performance based specifications:
- allows more contractor innovation
- modulus requirements should be based on materials using for construction
- risks need to be shared between owner and the contractor. Be conservative to start with.
- MnDOT (Rebecca Embacher) use a minimum 3.2km lane requirement for IC projects
- Use IC as a comparative tool for bulk earthworks following the Austrian Standard (Johannes Pistrol – Vienna University of Technology)
- Training plays a very significant role
- Staff turnover leads to knowledge loss
- Data missing and spatial differences
- Protocols important for how to setup site and machines and how to carry out an IC project (including data management e.g. file naming) are really important
The first day of the workshop (29 Sept 2021) was devoted to the state-of-the-art intelligent compaction with an emphasis on new theoretical developments and emerging technology that can advance the current state of knowledge of IC, increase the accuracy and optimal use of in-situ tests and calibration methods, and improve the estimation of the properties of compacted pavement layers in real-time with a view to performance-based IC.
The second day of the workshop (30 Sept 2021, AEST) was devoted to the state of the practice of IC with an aim to summarise the lessons learned around the globe on implementing IC technology including experiences in the implementation/development of IC specifications and cost-benefit analysis of IC.
Insitutek’s Robin Power chaired the final session of the conference which was a panel discussion with many of the speakers and invited panelists.
Our role is to transform aspects of geotechnics, earthworks and pavements and we have been doing this for more than 15 years. We aspired for IC implementation in Australia and New Zealand to benefit from the more than 30 years of international experience, from Europe, China, Japan and the USA. Hence in 2018 we arranged the first workshop in the region on the topic bringing together contractors, industry vendors, consultants, industry bodies, road agencies and researchers. We are so pleased to see that IC is going momentum. Insitutek provides Intelligent Compaction (IC) advice and support which helps our clients push forward with confidence.
To learn more about Intelligent Compaction and how Insitutek can help you, visit our website or contact us.
To learn more about the workshop, click here.
After scouring the market, we settled on the PANDA DCP test equipment as it offered the technical capability and, moreover, the flexibility required to work in the restricted environment our project presented; overhead clearance typically at 1500mm but as low as 1200mm. We had a unique problem that required a unique solution and that’s precisely what we found through the team at Insitutek and the PANDA equipment. The ease of assembly, intuitive operability and compact nature of the equipment, made light of the numerous soundings we required across a widely dispersed area.
FH is now routinely using the LWD with very good feedback and useful engineering data. The equipment is an easy to use Zorn LWD.
We find the Insitutek team extremely helpful and their knowledge of the equipment and its capabilities is a great resource for our staff.
Insitutek Blogs
On 2 August 2024, geomechanics professionals gathered in Canberra for the Australian Geomechanics Society ACT Insitu Testing Practical Workshop. The event focused on practical demonstrations of key insitu testing methods, including Cone Penetration Testing (CPT), Static Plate Load Test (PLT), Dynamic Probing Super Heavy (DPSH), Light Weight […]
Have you ever wished your Plate Load Test equipment would operate itself? Then our static plate load test with automatically operating battery hydraulic pump is definitely something for you. 🙂 Typically, a hydraulic hand pump is used to apply 15 to 20 load increments over two loading cycles by the operator. One test lasts 20-30 […]
We want to share details of a practical AGS Insitu Testing workshop on 2 August, share something for those working on slope stability and for those in land development and tip you off on getting early bird prices for a couple of up-coming conferences in Australia. If you are interested in modern insitu testing methods […]